——————————————————————————–
Project Description
——————————————————————————–
Commercial District
City Development
Outdoor
Shopping Mall
——————————————————————————–
Project Description
——————————————————————————–
Green
Shopping Center
Concept
Anywhere
——————————————————————————–
Project Description
——————————————————————————–
Atelier / Atölye
The property is located near Bodrum, Turkey; in the quiet hinterland of the heavily frequented, built up coast which adjusted its whole structure to cope with massive tourism…
——————————————————————————–
Project Description
——————————————————————————–
EPO, the European Patent Office Vienna, is located in the back part of a property, in direct visibility to the biggest historical grown garden network of Vienna‘s inner districts, surrounded by numerous gardens.
——————————————————————————–
Project Description
——————————————————————————–
Novi Beograd – the unfinished third city located in the Puszta between Zemun and the old Belgrad, flanked by the Danube and Seva, built under Josip Broz Tito. Close by the former parliament of Yugoslavia “B26” rises…
——————————————————————————–
Project Description
——————————————————————————–
To construct a disposition between the old and the new buildings the storeys are twisted against each other. The twisted storeys include the tangent of the road curve counter – rotating in the construction…