Klosterneuburg Abbey
Gallery
Concept
- Initiative
- reconstruction of the original inventory
- Architecture
- enclosure of the entrance and spiral staircase – modest and reserved
- Technology
- the technology should meet the requirements of a modern commercial enterprise
Solution
The farm building was brought up to date with the latest technology. In this way, the building can live on in its centuries-old tradition.
Subsequent fixtures that were not part of the original inventory were essentially demolished and the rooms returned to their original state.
The old floor structure was demolished and replaced by a new one, with a surface that meets the hygienic requirements.
A new steel staircase at the entrance and a glass-steel construction as an enclosure for the existing spiral staircase, leading to the basement, were added.
Info
Category | Industrial |
---|---|
City | Klosterneuburg |
Commissioner | Stift Klosterneuburg |
Period | 2009–2010 |
Type | direct |
Status | built |
Details | net floor area: 470m² |
Copyright | driendl*architects ZT GmbH |
Images | Milli Kaufmann |
Media
- Generate Pdf
- Share Project