Klosterneuburg Abbey

Concept

Initiative
reconstruction of the original inventory
Architecture
enclosure of the entrance and spiral staircase – modest and reserved
Technology
the technology should meet the requirements of a modern commercial enterprise

Solution

Img 2233

The farm building was brought up to date with the latest technology. In this way, the building can live on in its centuries-old tradition.

Subsequent fixtures that were not part of the original inventory were essentially demolished and the rooms returned to their original state.

The old floor structure was demolished and replaced by a new one, with a surface that meets the hygienic requirements.

A new steel staircase at the entrance and a glass-steel construction as an enclosure for the existing spiral staircase, leading to the basement, were added.

Info

Category Industrial
City Klosterneuburg
Commissioner Stift Klosterneuburg
Period 2009–2010
Type direct
Status built
Details

net floor area: 470m²

Copyright driendl*architects ZT GmbH
Images Milli Kaufmann

Media